Floor The Record Sign In
119th Congress · January 3, 2025 to January 3, 2027Everything here covers this Congress only. The newly elected 120th Congress takes over on January 3, 2027.
BillsHouse bill

State Planning For Reliability And Affordability Act

H.R. 3628Energy
Where it stands
  1. Introduced
  2. Committee
  3. House
  4. Senate
  5. President
  6. Law
Passed the House. Now it is the Senate's turn. How a bill becomes a law

Official title: State Planning for Reliability and Affordability Act

In One Sentence · AI-written

The bill would require certain state utility regulators to consider rules ensuring electricity remains reliably available over a 10-year period from qualifying generation facilities.

The Short Version AI-written

The bill applies to state authorities that regulate electric utilities using integrated resource plans, which project future electricity needs. These regulators would have to consider requiring utilities to include measures ensuring reliable electricity availability over 10 years, either by keeping reliable generation facilities running or by buying power from them. The bill defines reliable generation facilities as those that can run continuously for at least 30 days, have on-site fuel or contracted equivalents, can operate in emergencies and severe weather, and provide services such as frequency and voltage support.

Drafted by AI from the official title and the Congressional Research Service summary, then shown as-is. It can contain mistakes. The official summary is below so you can compare.

What Is Actually In It

The latest text, as passed by the House, has 3 sections.

Counted from the text printed by the Government Publishing Office. Read the full text.

How The Text Changed

As introduced in the House: State Planning for Reliability and Affordability Act · 2 sectionsAs passed by the House: State Planning for Reliability and Affordability Act · 3 sections

The Full Official Summary

State Planning for Reliability and Affordability Act This bill requires certain state authorities that regulate electric utilities to consider the establishment of measures regarding the reliable availability of electricity over specified time periods.

Show the whole summary

These requirements would apply to electric utilities that use integrated resource plans—plans that project future electricity use to ensure resource adequacy, as opposed to utilities that rely on capacity markets, which use price trends for resource planning. Specifically, the state authorities must consider requiring the integrated resource plans of electric utilities to include measures to ensure the reliable availability of electric energy over a 10-year period to maintain the operation of reliable generation facilities or the procurement of electric energy from reliable generation facilities. The bill defines reliable generation facilities as facilities that enable the generation of electric energy on a continuous basis over a period of not fewer than 30 days; have adequate fuel or a continuously available energy source on-site to enable the continuous generation of electric energy for at least 30 days, or have contractual obligations that achieve the same; have operational characteristics to enable the generation of electric energy during emergency and severe weather conditions; and provide services such as frequency support and voltage support.

Written by the Congressional Research Service, a non-partisan office of the Library of Congress.

House Votes On This Measure

The Senate has not held a recorded vote on this. It may not have reached the Senate yet, or it may have passed there without a recorded vote.

Speak up

Tell The People Who Represent You What You Think About Energy

Three people in Congress vote on your behalf: one representative in the House and two senators. A call or a message from someone they represent is counted, and it takes two minutes.

or

We do not track you or sell your data. The lookup happens on your own device, and your ZIP code is only saved with us if you subscribe.