Floor The Record Sign In
119th Congress · January 3, 2025 to January 3, 2027Everything here covers this Congress only. The newly elected 120th Congress takes over on January 3, 2027.
BillsHouse bill

American Enrichment Deployment Act

H.R. 9612Energy
Where it stands
  1. Introduced
  2. Committee
  3. House
  4. Senate
  5. President
  6. Law
Passed the House. Now it is the Senate's turn. How a bill becomes a law

In One Sentence · AI-written

The bill would let uranium enrichment facilities be built before the Nuclear Regulatory Commission issues a license, under the same terms that apply to other nuclear fuel facilities.

The Short Version AI-written

Under current law, a Nuclear Regulatory Commission license is required before a uranium enrichment facility can be built. This bill would allow construction to begin before that license is issued, treating enrichment facilities as it already treats uranium conversion and fuel fabrication facilities. Such facilities would still need an NRC license to process and handle special nuclear material and source material. The NRC would be required to issue or revise its regulations to carry out the bill within 180 days of enactment.

Drafted by AI from the official title and the Congressional Research Service summary, then shown as-is. It can contain mistakes. The official summary is below so you can compare.

What Is Actually In It

The latest text, as passed by the House, has 2 sections.

Counted from the text printed by the Government Publishing Office. Read the full text.

The Full Official Summary

The following analysis is based on draft bill text that was made available by the House of Representatives and may differ from the bill text as introduced.

Show the whole summary

American Enrichment Deployment Act This bill allows for the construction of a uranium enrichment facility before a license is issued by the Nuclear Regulatory Commission (NRC). Under current law, a license is required from the NRC prior to the construction of a uranium enrichment facility. Under the bill, uranium enrichment facilities are allowed to be constructed under the same terms and conditions applicable to other fuel cycle facilities (i.e., uranium conversion and fuel fabrication facilities). Such facilities must be licensed by the NRC to process and handle special nuclear material and source material. NRC must issue or revise regulations to carry out this bill not later than 180 days after enactment.

Written by the Congressional Research Service, a non-partisan office of the Library of Congress.

House Votes On This Measure

The Senate has not held a recorded vote on this. It may not have reached the Senate yet, or it may have passed there without a recorded vote.

Speak up

Tell The People Who Represent You What You Think About Energy

Three people in Congress vote on your behalf: one representative in the House and two senators. A call or a message from someone they represent is counted, and it takes two minutes.

or

We do not track you or sell your data. The lookup happens on your own device, and your ZIP code is only saved with us if you subscribe.